A massive tunnel boring machine has arrived in southwest Detroit as part of an $87 million infrastructure project aimed at protecting neighborhoods from flooding during heavy rain events.
Great Lakes Water Authority Chief Operating Officer Navid Mehram says the tunnel will reduce the risk of flooding.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results